Global Shipping Co.
Chicago, IL
2022
1.2M sq ft
$85M
PROJECT OVERVIEW
A state-of-the-art automated distribution center situated on the riverfront. Designed for 24/7 operations with high-bay storage and automated guided vehicle (AGV) paths.
The Challenge
Poor soil conditions near the riverbed required extensive ground improvement and deep pile foundations to support the heavy industrial loads.
The Solution
We installed over 2,000 driven piles and utilized a vibro-replacement stone column technique to stabilize the soil. The slab-on-grade was reinforced with steel fibers to support heavy racking loads.
Project Details
- Category Industrial
- Architect Industrial Design Group
- Status Completed
PROJECT GALLERY
START YOUR PROJECT TODAY
Ready to build something great? Contact our team to discuss your project requirements, request a quote, or schedule a consultation.
Headquarters
400 Sibley Street,
St. Paul, MN 55101
Phone
+1 (651) 555-0198
Mon-Fri 8am - 6pm CST
info@cornerstone-construction.com